PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Fixing the pour stop at the 4th Floor East Elevation  (2).jpg Concrete Planks for the Detention Cells (1).jpg Concrete Planks for the Detention Cells (2).jpg Continued layout block at the Detention Cells (1st Floor) Facing East.jpg Installed a steel post at the 4th floor North Elevation.jpg Installed steel post and clips at the East Elevation.jpg Installing ductwork fitters at the 2nd floor Facing East.jpg Installing ductwork hangers at the 3rd floor Facing North.jpg Installing Roof Drains and Overflow roof drains at the lower roof Facing East.jpg
Previous pageNext page Installed a steel post at the 4th floor North Elevation
Installed a steel post at the 4th floor North Elevation